Breezyloo's with a CWT Collection Well, with some modifications to the lifting gear, were transported from the nearest road access to site by excavator and 4WD.
Transport to site and installation of each building was achieved in 1 day.
These buildings went through the Snowy Mountains fires in 2003. The fire was hot enough to melt the colour coating from the Colorbond cladding and melt the vent-stack, but structurally the building remained in perfect condition.